go to top scroll for more

Projects


Projects: Projects for Investigator
Reference Number NIA_NGGT0091
Title Installation Risk and Technology Assessment Model
Status Completed
Energy Categories Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
No email address given
National Grid Gas Transmission
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 May 2016
End Date 01 December 2017
Duration 19 months
Total Grant Value £159,000
Industrial Sectors Technical Consultancy
Region London
Programme Network Innovation Allowance
 
Investigators Principal Investigator Project Contact , National Grid Gas Transmission (100.000%)
Web Site http://www.smarternetworks.org/project/NIA_NGGT0091
Objectives The objective of the Installation Risk and Technology Assessment Model is to develop the framework for a new low cost connection strategy for inline inspection across the entirety of the NTS installations (circa 200). Develop a connection strategy which will maximise inline inspection coverage whilst minimising inspection costs by optimising the connection process at a high pressure installation by 50%.
Abstract Once developed, internal inspection technology for buried pipework at high pressure installations will rely on standard connection techniques to access buried pipework which can be extremely expensive and potentially disruptive. Standard connection methods have not changed for a long period of time and there is significant scope to reduce this cost by fundamentally challenging the end to end connection process and exploring new technology that will reduce cost and minimize disruption. Innovative connection methods would represent a significant deviation from established practices and therefore represent a significant challenge to the business. As a result, this work falls outside the scope of existing inline inspection projects but is applicable to any form of internal technology employed in the future. Although aimed at high pressure installations this approach could also be extended to National Grid pipelines that are currently not subject to in-line inspection (approximately 100km). An Installation Risk and Technology Assessment Model that will: Produce a matrix of inspection methods vs connection requirements. Recommend a streamlined process for the connection options. Provide a risk model to assess the most at risk installations. In order to: Build a connectivity strategy that will maximise inspection benefits per site whilst minimising inspection costs. Change Control 1 -In order to map to a NTS wide matrix, assist with the development of the model and define a clear ranking for the 28 selected sites, more rigorous assessments are required. Therefore additional site visits are essential and so additional time is required. In addition the results from the Above Ground Installation (AGI) Cathodic Protection (CP) survey will be included in the model which will establish a full comprehensive diagnosis and what action is required for the asset.Note : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above
Publications (none)
Final Report (none)
Added to Database 10/09/18